Value your opinion but i think your figures are out..
Jan was 163kt milled for 6,498oz and the end of the month they had 108kt @ 1.5g/t Au stock piled
Feb, they burned through that 108kt and them some to mill a total of 150kt for 6,713oz and at the end of the month they ended up with 144kt of stock piled ore@ 1.7g/t
As you can see, stock pile and grade has been increasing, they advised grade and stock pile would increase from Jan and it did, they are advising the same for march. I can't vouch for long term but they are defiantly over delivering at the moment.
- Forums
- ASX - By Stock
- WMC
- Ann: Another Record Month of Gold Production for Blackham
Ann: Another Record Month of Gold Production for Blackham, page-180
-
- There are more pages in this discussion • 204 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)