Responding to your questions, I was referring to ASN’s planned DLE processing plant. This assumed a takeover of the Li./Br. rights.
Regarding the second question, detailed above is a description of the failed JV T&C’s. Basically, the second version called for an initial $150k, a $3M loan and $1m in shares for 70% with an option to purchase the balance. It excluded about 10k hectares of Potash permit applications under BML final review.
These terms IMO,reflects at the time of the deal AP’s strategic Potash focus.
- Forums
- ASX - By Stock
- ASN
- Ann: Anson Confirms Site for Processing Plant at Green River
Ann: Anson Confirms Site for Processing Plant at Green River, page-78
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.5¢ |
Change
-0.005(3.13%) |
Mkt cap ! $200.0M |
Open | High | Low | Value | Volume |
15.5¢ | 17.0¢ | 15.0¢ | $843.3K | 5.360M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 204087 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 32608 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 204087 | 0.155 |
4 | 146195 | 0.150 |
5 | 493500 | 0.145 |
4 | 328320 | 0.140 |
4 | 26592 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.165 | 117600 | 2 |
0.170 | 582969 | 15 |
0.175 | 820116 | 10 |
0.180 | 788649 | 10 |
0.185 | 270420 | 6 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |