I am a completion engineer so I can help here, you can certainly perforate two seperate zones and seal them. The differential pressure systems and the likely changes required in the process flow due the different LI concentration from the two zones will almost certainly mean you don’t produce from the two zones simultaneously but use a SSD- sliding sleeve door to isolate one zone while the other is producing. This is controlled using hydraulic pressure at surface.
technically, this isn’t particularly too difficult or unique and probably they’d be already planning to do this to have a lower CAPEX well construction. These wells and associated surface facilities cost around 4-5 MM to construct. A lot cheaper to add the SSD to the completions design for an extra 100k and have the operational flexibility to operate two zones from the same well bore
GLTAH and DYOR
- Forums
- ASX - By Stock
- Ann: Anson Delivers 1Mt LCE Mineral Resource at Paradox
I am a completion engineer so I can help here, you can certainly...
-
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
|
|||||
Last
11.0¢ |
Change
0.005(4.76%) |
Mkt cap ! $141.9M |
Open | High | Low | Value | Volume |
10.5¢ | 11.0¢ | 10.0¢ | $84.14K | 786.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 286817 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 308238 | 0.105 |
10 | 657540 | 0.100 |
1 | 100000 | 0.099 |
5 | 205001 | 0.098 |
2 | 105220 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 286817 | 6 |
0.120 | 825468 | 9 |
0.125 | 387452 | 7 |
0.130 | 389682 | 5 |
0.135 | 818086 | 6 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online