No way to tell from this document SDK. This is only the drilling plan that ends at the production casing (9 5/8”). No information whatsoever about the completion design there.
The MD ends at 6600’ which I think is just above the Mississippian. If the Mississippian in indeed deeper than the production casing in this plan then they will need to run a liner hanger and deepens the hole to reach that zone before they run the final completion.
- Forums
- ASX - By Stock
- ASN
- Ann: Anson Delivers 1Mt LCE Mineral Resource at Paradox
Ann: Anson Delivers 1Mt LCE Mineral Resource at Paradox, page-397
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.3¢ |
Change
-0.002(2.11%) |
Mkt cap ! $120.1M |
Open | High | Low | Value | Volume |
9.4¢ | 9.4¢ | 9.2¢ | $97.21K | 1.047M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 75914 | 9.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.4¢ | 31914 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 25914 | 0.093 |
2 | 251473 | 0.092 |
4 | 468606 | 0.091 |
10 | 412823 | 0.090 |
2 | 122000 | 0.089 |
Price($) | Vol. | No. |
---|---|---|
0.094 | 31914 | 1 |
0.096 | 322800 | 2 |
0.097 | 501693 | 2 |
0.098 | 76585 | 1 |
0.099 | 797750 | 2 |
Last trade - 16.10pm 06/09/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |