Moving the pilot plant from Cane Ck 32-1 to near LC2 is interesting.
6 months ago CC was to be the site of the future commercial plant, there must have been a bore hole close by for waste brine discharge.
A pad is already cleared, with bunded areas (2) for holding tanks, 2 in place and piped up to cc32 well head.
Electricity is very close.
The move to LC2 will require the grading of a pad.
Provide own power generation.
As for production from more than one point.
Skyline is about 3k's away (about 1k from CC).
Coors (not sampled) about 2k's away.
Long Canyon no 1 is 800 metres away.
- Forums
- ASX - By Stock
- ASN
- Ann: Anson To Re-Enter Wells to Increase Li & Br Resource
Ann: Anson To Re-Enter Wells to Increase Li & Br Resource, page-19
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.5¢ |
Change
-0.003(4.41%) |
Mkt cap ! $90.00M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.5¢ | $129.2K | 1.931M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 225586 | 6.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.7¢ | 1736 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 225586 | 0.065 |
2 | 270000 | 0.064 |
1 | 310000 | 0.063 |
1 | 275000 | 0.062 |
3 | 289195 | 0.061 |
Price($) | Vol. | No. |
---|---|---|
0.067 | 1736 | 1 |
0.068 | 100008 | 1 |
0.069 | 507035 | 4 |
0.070 | 179014 | 2 |
0.071 | 3000 | 1 |
Last trade - 16.10pm 14/11/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |