How can the "PFS was “a slight beat” on expectations"??? It was demonstrably worse than the scoping study on every aspect of cost while materially reducing the LOM, first copper production, annual metal production, NPV, IRR etc despite using higher metal prices... Unless I missed some releases from NWC guiding down expectations, and all the interviews were guiding good and better, how is it Canaccord thought the PFS would be actually worse than it was? Rhetorical question, don;t bother answering...
- Forums
- ASX - By Stock
- Ann: Antler Copper Project Pre-Feasibility Study
How can the "PFS was “a slight beat” on expectations"??? It was...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.001(5.00%) |
Mkt cap ! $59.64M |
Open | High | Low | Value | Volume |
2.0¢ | 2.2¢ | 2.0¢ | $123.4K | 6.039M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 584548 | 2.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.2¢ | 2022713 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 584548 | 0.021 |
4 | 4715618 | 0.020 |
4 | 633918 | 0.019 |
10 | 2562277 | 0.018 |
5 | 2375850 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.022 | 2022713 | 3 |
0.023 | 601473 | 5 |
0.024 | 740000 | 5 |
0.025 | 493000 | 5 |
0.026 | 100000 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
NWC (ASX) Chart |