APA 0.30% $8.39 apa group

Ann: APA signs agreements for the Hunter Power Project, page-2

  1. 20,193 Posts.
    lightbulb Created with Sketch. 1779
    APA Group Limited ACN 091 344 704 | APA Infrastructure Trust ARSN 091 678 778 | APA Investment Trust ARSN 115 585 441
    Level 25, 580 George Street Sydney NSW 2000 | PO Box R41 Royal Exchange NSW 1225
    Phone +61 2 9693 0000 | Fax +61 2 9693 0093
    APA Group | apa.com.au
    About APA Group (APA)
    APA is a leading Australian Securities Exchange (ASX) listed energy infrastructure business. We own and/or manage
    and operate a diverse, $21 billion portfolio of gas, electricity, solar and wind assets. Consistent with our purpose to
    strengthen communities through responsible energy, we deliver approximately half of the nation’s gas usage and connect
    Victoria with South Australia and New South Wales with Queensland through our investments in electricity transmission
    assets. We are also one of the largest owners and operators of renewable power generation assets in Australia, with
    wind and solar projects across the country.
    APA Infrastructure Limited is a wholly owned subsidiary of APA Infrastructure Trust and is the borrowing entity of APA Group.
    For more information visit APA’s website, apa.com.au.
    20 June 2022
    ASX ANNOUNCEMENT
    APA Group (ASX: APA)
    APA signs transport, storage and development agreements
    for the Hunter Power Project
    Leading Australian energy infrastructure business, APA Group (ASX: APA), today announced the execution of a
    30-year Gas Transportation and Storage Agreement and a Development Agreement with Snowy Hydro Limited
    (Snowy Hydro), to commence the development of a pipeline connection, called the Kurri Kurri Lateral, which will
    include storage, to the Hunter Power Project.
    APA will build, own and operate the Kurri Kurri Lateral, a gas transmission pipeline approximately 20 km in length,
    which will connect the Sydney to Newcastle Pipeline to the Hunter Power Project at Kurri Kurri in NSW, and a 70
    TJ gas storage facility to service the Hunter Power Project, which are targeting completion by late 2023. The
    development is subject to APA obtaining certain third-party approvals for the development and operation of the
    APA facilities (including obtaining a pipeline licence) and various development matters being agreed with Snowy
    Hydro.
    Snowy Hydro may extend the Gas Transportation and Storage Agreement for a further 10 years.
    APA’s total construction costs for the project are currently estimated to be around $264 million. Final capital
    expenditure will be subject to detailed engineering design, which is expected to be completed by late 2022. APA
    has worked closely with Snowy Hydro to ensure that the Kurri Kurri Lateral will be hydrogen-blend ready, as well
    as committing to procuring electric drive compressors to minimise the emissions intensity of operations.
    APA estimates construction jobs will peak at almost 400 workers when construction of the pipeline connection,
    storage and compressor station overlaps.
    APA CEO and Managing Director, Rob Wheals, said APA was pleased to be working with Snowy Hydro on the
    Kurri Kurri Lateral.
    “APA looks forward to delivering this key piece of infrastructure for the Hunter Power Project, which in turn should
    facilitate further expansion of renewable generation in the National Electricity Market. The current energy crisis
    has underscored the critical role that gas will continue to play in our energy mix, delivering affordable firming for
    renewable generation, energy security, and high heat capability for the industrial sector,” Mr Wheals said.
    “As coal is withdrawn from the National Electricity Market, natural gas is the workhorse of the energy grid. Its
    flexibility and reliability ensure it is able to be rapidly deployed and sustained for extended periods, delivering
    energy security when it’s needed most.
 
watchlist Created with Sketch. Add APA (ASX) to my watchlist
(20min delay)
Last
$8.39
Change
-0.025(0.30%)
Mkt cap ! $10.72B
Open High Low Value Volume
$8.43 $8.44 $8.36 $2.003M 238.6K

Buyers (Bids)

No. Vol. Price($)
8 5693 $8.38
 

Sellers (Offers)

Price($) Vol. No.
$8.39 10816 22
View Market Depth
Last trade - 11.35am 19/06/2024 (20 minute delay) ?
APA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.