BYE 1.64% 6.0¢ byron energy limited

  1. 109 Posts.
    lightbulb Created with Sketch. 16
    Hi Oldgeo,

    thanks for the reply.
    It all makes sense what you are saying. Current well max production is constrained @2300 BPD due to the diameter of the tubing.

    I was hoping that if they are happy with the pressure on the upper O sands they may decide to re-drill the lower O sands, maybe doubling the potential BPD. (if cost effective, given that the drilling companies catastrophic error is responsible for the smaller diameter tubing being used).

    Are the upper and lower O sands considered 1 or 2 wells.

    Cheers

    Arthuros
 
watchlist Created with Sketch. Add BYE (ASX) to my watchlist
(20min delay)
Last
6.0¢
Change
-0.001(1.64%)
Mkt cap ! $64.72M
Open High Low Value Volume
6.4¢ 6.4¢ 5.7¢ $36.83K 614.8K

Buyers (Bids)

No. Vol. Price($)
3 600000 5.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.0¢ 103244 1
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
5.9¢
  Change
-0.001 ( 3.28 %)
Open High Low Volume
6.5¢ 6.5¢ 5.7¢ 124196
Last updated 15.59pm 03/05/2024 ?
BYE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.