FBR 3.85% 5.0¢ fbr ltd

Ann: Appendix 3B, page-10

  1. 3,372 Posts.
    lightbulb Created with Sketch. 690
    I think that to have a house completed by 12th Nov 2018, the Hadrian X would need to be deemed finished well before 30th Sept.
    I'm expecting a long period of testing as I will not be surprised if things go wrong / they realise during the testing that changes need to be made in order to begin the attempt to build an entire 3 bedroom house in 3 days.
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.