"The concept design phase covered a wide range of disciplines and project work package areas including hydrodynamic modelling, wave tank testing, electrical typology, offshore site studies, grid connection, instrumentation and controls, power take off architecture, installation and maintenance philosophies and tether and mooring options."
It will be interesting to see what they have come up with. This suggests there are a number of anchoring options on the drawing board?
"The concept design phase covered a wide range of disciplines...
Add to My Watchlist
What is My Watchlist?