Gocerler-5 Well Flows at 10.4MMcfd
21/2/03 7:34:00 PM
At 2.30 am WST on Friday, 21 February 2003, the Gocerler-5 well was
perforated and in a series of tests flowed at a stabilised rate of
10.4 mmcfd through a half inch surface choke at a surface flowing
pressure 1640 psi.
The well has been shut in awaiting tie-in to the central gas
processing facility.
This is a very pleasing result and proves continuity of reservoir and
reservoir quality in the northeastern sector of the field.
Joint Venture approves drilling of Adatepe-1
Yesterday, the Thrace JV approved the drilling of the Adatepe
prospect, located 6 kilometres east-southeast of the Gocerler
Gasfield.
The Adatepe prospect is an anticlinal structure with seismic
amplitude anomalies at 5 stratigraphic levels. The prospect is well
definedwith high quality 3D seismic.
The Adatepe-1 well will be drilled with the rig just released from
the Gocerler-5 well. Drilling is anticipated to start towards the
end of March 2003.
The Gocerler Gasfield is operated by Amity and owned by Amity (50%)
and Turkiye Petrolleri AO (50%).
For further information and updates, please refer to Amity's website
at www.amityoil.com.au.
A Barton
CHAIRMAN
- Forums
- ASX - By Stock
- AYO
- alert : moving on.......!
AYO
unknown