How long has the Mildura saga dragged on and still nothing concrete about a completion date for construction or when the facility will go live?
Just keep dangling the carrot with vague promises long enough so that their salaries get paid and the noobs don’t cut their losses and run.
DYOR IMO
- Forums
- ASX - By Stock
- Ann: Appendix 4C - quarterly
How long has the Mildura saga dragged on and still nothing...
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $27.12M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAN (ASX) Chart |
Day chart unavailable