Why do they need this:
”As part of the performance testing program, alternative designs for the hot equipment, including the reactor andheat exchanger, are being developed concurrently. This equipment will be installed and tested followingcompletion of the initial phase of the performance testing program that utilises the currently installed firstgeneration hot reactor and heat exchanger. The alternative designs will also provide risk mitigation in the form ofredundancy to ensure the outcomes of the performance testing program are achieved. The material for thealternative heat exchanger design was delivered in December 2023 and fabrication of the exchanger hascommenced. Alongside this, Hatch has reached the final stages of detailed design for the next generation reactortechnology and procurement activities are already underway.”
- Forums
- ASX - By Stock
- Ann: Appendix 4C - quarterly
Why do they need this:”As part of the performance testing...
-
- There are more pages in this discussion • 61 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
29.5¢ |
Change
0.005(1.72%) |
Mkt cap ! $67.88M |
Open | High | Low | Value | Volume |
29.5¢ | 30.0¢ | 29.0¢ | $31.71K | 108.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 31978 | 29.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
29.5¢ | 17417 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 31978 | 0.290 |
4 | 18750 | 0.285 |
6 | 71082 | 0.280 |
6 | 25092 | 0.275 |
5 | 27376 | 0.270 |
Price($) | Vol. | No. |
---|---|---|
0.295 | 17417 | 2 |
0.300 | 79726 | 6 |
0.305 | 16393 | 1 |
0.310 | 17500 | 3 |
0.315 | 96527 | 2 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |