Hi Hingdog
I dare say the cost of production ATM would be at a high point with startup etc.
I have pasted below a few sentences from the Quarterly and note reference to copper price increasing, improving operational control and the commissioning of an on stream analyser.
To me, all in all a very positive story - no debt, producing copper in a rising market and sufficient nearby and further afield prospects to look towards a very long life mine.
The increase in the copper production between the February and March milling campaigns reflects the improving operational control in the processing plant, which will be further enhanced in April with the commissioning of the onstream analyser. With the copper price increasing during the quarter, it is certainly an excellent time to be ramping up copper production.
- Forums
- ASX - By Stock
- Ann: Appendix 5B for Quarter Ended 31 March 2024
Hi HingdogI dare say the cost of production ATM would be at a...
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.3¢ |
Change
-0.005(5.68%) |
Mkt cap ! $177.9M |
Open | High | Low | Value | Volume |
8.8¢ | 8.9¢ | 8.3¢ | $964.2K | 11.16M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 45178 | 8.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.4¢ | 417590 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 1409285 | 0.082 |
4 | 410956 | 0.081 |
8 | 441262 | 0.080 |
2 | 130000 | 0.079 |
6 | 423986 | 0.078 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 143543 | 1 |
0.084 | 417590 | 6 |
0.085 | 100000 | 1 |
0.086 | 147000 | 3 |
0.087 | 100000 | 1 |
Last trade - 13.09pm 16/05/2024 (20 minute delay) ? |
|
|||||
Last
8.3¢ |
  |
Change
-0.005 ( 5.47 %) |
|||
Open | High | Low | Volume | ||
8.8¢ | 8.9¢ | 8.2¢ | 5117143 | ||
Last updated 13.09pm 16/05/2024 ? |
Featured News
HGO (ASX) Chart |