AVR 8.35% $9.99 anteris technologies ltd

Going by the last two AGMs, in 2022 there were two next gen...

  1. 13,950 Posts.
    lightbulb Created with Sketch. 131
    Going by the last two AGMs, in 2022 there were two next gen projects then one in 2023. So the assumption is Wayne "after kicking tyres", was more impressed with the injection mould option. Wait and see after 2024 AGM if it has legs.
 
watchlist Created with Sketch. Add AVR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.