I think should be significant increase, a larger pit could allow deeper open pit mining. The MRE used a cut off grade of 0.5% for OP, UG was 1%. They originally planned OP down to 220m and then UG down to 690m. No idea how the pit engineering could change the OP depth but could go much deeper and therefore include a lot more tonnage as cutoff grades change.
- Forums
- ASX - By Stock
- Ann: Application for quotation of securities - CNB
I think should be significant increase, a larger pit could allow...
-
- There are more pages in this discussion • 41 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CNB (ASX) to my watchlist
(20min delay)
|
|||||
Last
51.5¢ |
Change
-0.030(5.50%) |
Mkt cap ! $88.54M |
Open | High | Low | Value | Volume |
54.0¢ | 55.0¢ | 51.5¢ | $164.7K | 308.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 699 | 51.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
53.0¢ | 1500 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 699 | 0.515 |
2 | 21950 | 0.510 |
2 | 21788 | 0.505 |
5 | 25980 | 0.500 |
1 | 20000 | 0.490 |
Price($) | Vol. | No. |
---|---|---|
0.530 | 1500 | 2 |
0.535 | 8206 | 1 |
0.550 | 14370 | 1 |
0.570 | 2500 | 1 |
0.575 | 25639 | 1 |
Last trade - 16.10pm 06/06/2024 (20 minute delay) ? |
|
|||||
Last
52.0¢ |
  |
Change
-0.030 ( 4.60 %) |
|||
Open | High | Low | Volume | ||
54.0¢ | 54.5¢ | 52.0¢ | 64695 | ||
Last updated 15.59pm 06/06/2024 ? |
Featured News
CNB (ASX) Chart |