I’m expecting the drill results to be announced long before any CR. This just increases the imperative to get the drill results in so that any CR will be at a more favourable SP and less dilution. My expectation is by early December before winter sets in.
BTW, I was implementing capital systems in a global mfg/mining co before retirement. These engineering studies, capital raising and plant construction takes years. No matter how ‘dream’ the team is, they are working with many Engineers and Government. Good luck with that Iggy.
My eyes are on the short term prize of favourable drill results.
- Forums
- ASX - By Stock
- LU7
- Ann: Appointment of Engineering Study Manager
Ann: Appointment of Engineering Study Manager, page-7
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LU7 (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.121M |
Open | High | Low | Value | Volume |
1.9¢ | 1.9¢ | 1.8¢ | $18.36K | 1.016M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 3359459 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.9¢ | 1681361 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 3359459 | 0.018 |
11 | 2454590 | 0.017 |
4 | 422500 | 0.016 |
2 | 240000 | 0.015 |
2 | 108289 | 0.014 |
Price($) | Vol. | No. |
---|---|---|
0.019 | 1681361 | 3 |
0.020 | 2963635 | 8 |
0.021 | 1250000 | 1 |
0.022 | 550000 | 2 |
0.023 | 250000 | 1 |
Last trade - 16.10pm 21/05/2024 (20 minute delay) ? |
|
|||||
Last
1.8¢ |
  |
Change
0.000 ( 5.26 %) |
|||
Open | High | Low | Volume | ||
1.8¢ | 1.9¢ | 1.8¢ | 996582 | ||
Last updated 15.48pm 21/05/2024 ? |
Featured News
LU7 (ASX) Chart |
The Watchlist
ATC
ALTECH BATTERIES LTD
Martin Stein, CFO
Martin Stein
CFO
Previous Video
Next Video
SPONSORED BY The Market Online