Exactly D1326. The tailings dam are nearing full. There is limited space or capacity for new or enlarged tailings dams. Tailings dam space is a critical requirement for the future operation of the processing plant.They have been filling up the valuable space with waste/low grade material. Either from Maldon or A1
There will be a need in the near future to spend further funds to develop further tailings dam capacity, when finances were only spent 12 months or so ago
- Forums
- ASX - By Stock
- CTL
- Ann: Appointment of Voluntary Administrators
Ann: Appointment of Voluntary Administrators, page-71
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.399M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |