Exactly D1326. The tailings dam are nearing full. There is limited space or capacity for new or enlarged tailings dams. Tailings dam space is a critical requirement for the future operation of the processing plant.They have been filling up the valuable space with waste/low grade material. Either from Maldon or A1
There will be a need in the near future to spend further funds to develop further tailings dam capacity, when finances were only spent 12 months or so ago