The original 2018 Indicated resource was 8.7% Pb. In 2023 this was revised down to 7.3%. In 2024 just prior to admin they are reporting stope grades of 5.7%.
Even with a dilution factor (they used circa 8% in the 2019 DFS for a mined lead grade of 8.1% from a reserve grade of 8.8%) the stope grade is like 30% off the original modelled diluted reserve grade driving the project. Even worse if you include development ore.
The sensitivity analysis from the 2019 DFS below shows the project loses value very quickly when process recovery falls below 10%. 30% as we quickly found out is catastrophic...
My personal opinion is they may have underestimated the dilution factor / complexity of the orebody when running the numbers.
- Forums
- ASX - By Stock
- Ann: Appointment of Voluntary Administrators
The original 2018 Indicated resource was 8.7% Pb. In 2023 this...
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online