150ppm is 80mg/ltr OR .08g/ltr OR .00008kg/ltr - based on Lithium density of 534kg/m3
.54 cmtr/sec = 540 ltrs/second - flow allowance
540 x .00008/ kg / second OR .0432kg/sec
recovery is ~90% so .038kg/sec
If we assume the plant can keep up with the flow then
2.2kg/min OR 132 kg/hr OR .92tonnes for a 7hr shift OR 2.76tonnes/day (working 24hrs) OR 1000 tonnes a year.
What am I missing here? Genuine question - not being a troll.
- Forums
- ASX - By Stock
- Ann: Approval from State of Utah for Brine Extraction -GreenRiver
150ppm is 80mg/ltr OR .08g/ltr OR .00008kg/ltr - based on...
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.7¢ |
Change
-0.004(4.40%) |
Mkt cap ! $112.4M |
Open | High | Low | Value | Volume |
9.1¢ | 9.3¢ | 8.6¢ | $146.2K | 1.647M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 686284 | 8.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.7¢ | 9264 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 686284 | 0.086 |
5 | 711500 | 0.085 |
1 | 100000 | 0.084 |
1 | 30000 | 0.083 |
2 | 220000 | 0.082 |
Price($) | Vol. | No. |
---|---|---|
0.088 | 86728 | 5 |
0.089 | 10000 | 2 |
0.090 | 43333 | 2 |
0.091 | 96429 | 3 |
0.093 | 114460 | 3 |
Last trade - 14.45pm 10/09/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |