re: Ann: Approval to Commence Oil Production ... By PNA
Mayor Cynthia Moreno of Aloguinsan town in southern Cebu has assured the municipal government’s full support for the oil drilling project in the Malolos-1 Oil Field which is set to start next month.
Moreno made the assurance due to possible protest action to be launched by some environmental groups.
“We can do our best to help implement the project,” Moreno said.
But Moreno said protecting the oil firm is not only the concern of the local government but also of the Department of Energy, Department of Environment and Natural Resources and the province of Cebu.
The DOE approved last week the application of the Australian-based Gas2Grid Limited to commence the Malolos-1 extended oil production.
Once operational, the local government units involved — from the province, municipality down to the barangay — will get their respective shares of the gross revenues.
Residents in Barangay Olango, where the Malolos-1 oil rig is located, welcomed the project considering the benefits it can give to them.
Vice Mayor Augustus Caesar Moreno, husband of the mayor, said that when the exploration started in 2005, Gas2Grid employed around 50 local residents.
Another 30 local residents were hired during the testing stage.
A statement from Gas2Grid said the operation is still in a testing stage because the company still has to confirm commercial viability of the oil field.
The DOE had previously extended Gas2Grid’s Service Contract 44 for a 12-month period from Jan. 29, 2014 so it can do more tests, the statement also said.
The company said the prolonged oil production testing aims to gather sufficient technical information to confirm commercial viability of the Malolos Oil Field and to justify the DOE awarding on Gas2Grid a 25-year production period.
The company earlier reported a “contingent resource” of oil in the two productive sandstones for the Malolos Oil Field.
It made a “low estimate” of 6.8 million barrels and a “high estimate” of 68.1 million barrels, with a “best estimate” of 20.4 million barrels of “total oil initially in place.”
- Forums
- ASX - By Stock
- GGX
- Ann: Approval to Commence Oil Production - Philip
Ann: Approval to Commence Oil Production - Philip, page-13
Featured News
Add GGX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.077M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GGX (ASX) Chart |
Day chart unavailable
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online