POD 2.78% 3.7¢ podium minerals limited

Ann: Approvals Open Door to Add Ounces From Undrilled 800mSection, page-3

  1. 7,872 Posts.
    lightbulb Created with Sketch. 1482
    if they can repeat those results at depth then we are flying. If they manage to drill it towards end of June then results should be in by first half of Aug or thereabouts.
 
watchlist Created with Sketch. Add POD (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.