2022 USD revenue was $250m.
An increase in tax from 0.5% to 3.5% (which is what the tax was before the government reduced it), would mean an additional $7.5m tax per annum for the remaining 4 year mine life.
That works back to 10c per share of additional cost over the next 4 year mine life of Area 1.
2022 USD revenue was $250m.An increase in tax from 0.5% to 3.5%...
Add to My Watchlist
What is My Watchlist?