A couple of preliminary questions and comments after a first pass at the ann:
1. Is it a waste dump or a low grade stockpile? if waste then I'm very happy with the grade; if stockpile then it's OK.
2. IMO the spodumene from recently-mined material should be in fair shape (i.e. not weathered, Li not leached) so trenching will highlight variability in orebody/mining rather than weathered vs fresh rock.
3. Not sure the person writing the ann has any mining experience, because processing dumps is much easier and cheaper than what 'could be mined in a straight forward open‐cut manner'. No blasting/scraping and limited grade control = $avings.
- Forums
- ASX - By Stock
- NPM
- Ann: Argentinean Project Update
Ann: Argentinean Project Update, page-20
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NPM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.359M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 1.1¢ | $3 | 300 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100454 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 83333 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100454 | 0.011 |
4 | 516099 | 0.010 |
3 | 775000 | 0.009 |
3 | 484383 | 0.008 |
3 | 1057283 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 83333 | 2 |
0.013 | 343807 | 2 |
0.014 | 240000 | 1 |
0.015 | 278000 | 2 |
0.017 | 646582 | 2 |
Last trade - 10.06am 11/11/2024 (20 minute delay) ? |
Featured News
NPM (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, MD & CEO
Charles Armstrong
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online