If it is a gas fired thermal oil based heating system (to allow good control of the process heat with PLC proportional oil flow control valves to process heat exchangers) then the system needs to be heated very slowly over a long period of time until the oil is safely above the water-steam phase change temp and then you can increase system temp up to operating temp fairly rapidly. But heating up a thermal system from a cold start does use a lot of gas and even more if it is cold ambient. Rincon was max 15C in the late afternoon last week but they likely had the heat plant warming all day and it was down near 7 degrees C in the early morning. It would be interesting to know what size burner is installed.
- Forums
- ASX - By Stock
- AGY
- Ann: Argosy confirms first batch of LCE produced
Ann: Argosy confirms first batch of LCE produced, page-433
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.95M |
Open | High | Low | Value | Volume |
3.5¢ | 3.6¢ | 3.5¢ | $21.90K | 625.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 827060 | 3.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.6¢ | 914756 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 827060 | 0.035 |
20 | 2362844 | 0.034 |
12 | 1365636 | 0.033 |
3 | 695000 | 0.032 |
6 | 1022657 | 0.031 |
Price($) | Vol. | No. |
---|---|---|
0.036 | 914756 | 8 |
0.037 | 1392804 | 7 |
0.038 | 1243900 | 6 |
0.039 | 1369010 | 8 |
0.040 | 720375 | 3 |
Last trade - 16.10pm 15/11/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online