GASNOR has a May update spreadsheet on installation progress.
The Salta Provence has only 3 current installs underway that have industrial users. Is one of the three for the Rincon project?
The industrial user installation for Salta reference numbers are 45,48 and 61 in the sheet.
They are all categorised as "Ramal" or branch lines - it each case it gives the diameter of the branch. In all cases the line diameter is listed as 51mm.
All three branch lines are stated as 90% complete, with respective install start dates of 11/1/17, 28/06/17 and 5/02/18 respectively
link to sheet download page : https://www.gasnor.com/informacion/102/mayo-2018
Fill your boots
- Forums
- ASX - By Stock
- Ann: Argosy confirms first batch of LCE produced
GASNOR has a May update spreadsheet on installation progress....
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.95M |
Open | High | Low | Value | Volume |
3.5¢ | 3.6¢ | 3.5¢ | $21.90K | 625.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 827060 | 3.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.6¢ | 914756 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 827060 | 0.035 |
20 | 2362844 | 0.034 |
12 | 1365636 | 0.033 |
3 | 695000 | 0.032 |
6 | 1022657 | 0.031 |
Price($) | Vol. | No. |
---|---|---|
0.036 | 914756 | 8 |
0.037 | 1392804 | 7 |
0.038 | 1243900 | 6 |
0.039 | 1369010 | 8 |
0.040 | 720375 | 3 |
Last trade - 16.10pm 15/11/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online