Nice little tail end to that announcement.
Armour has successfully drilled the Myall Creek 4A well, which is currently shut‐in on build‐up inwells on the Kincora Project, and this is an important contributor to growing positive cash flows.
preparation for the installation of the 2‐3/8’’ production tubing. Armour is awaiting the release of the
workover rig from another operator, and once the tubing is installed, it is antipated that the well will be
on‐line and in production later this month. The results of Myall Creek 4A well are still being received, and
evaluation of the data is being progressed and will assist in the design of future drilling and completions
operations in this field.
Armour is also enjoying significant liquids production of light oil or condensate and LPG in the restarted
- Forums
- ASX - By Stock
- AJQ
- Ann: Armour Awarded Further Acreage at Kincora Project, Qld
Ann: Armour Awarded Further Acreage at Kincora Project, Qld, page-2
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AJQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.31M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AJQ (ASX) Chart |
Day chart unavailable