I've prepared this application before for construction projects.
It usually isn't a big deal if the aquifer is large (which ours is) and if there aren't many other neighbours tapping into the supply (which there aren't at this stage).
Definitely in no way as big a deal from a time, cost, or preparation perspective as the EPA enviro approval.
- Forums
- ASX - By Stock
- Ann: Arrowsmith Central Water Bore
I've prepared this application before for construction...
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VRX (ASX) to my watchlist
|
|||||
Last
3.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $23.24M |
Open | High | Low | Value | Volume |
3.7¢ | 3.7¢ | 3.7¢ | $938 | 25.34K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 74655 | 3.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.9¢ | 69999 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 74655 | 0.037 |
1 | 64590 | 0.036 |
3 | 45821 | 0.035 |
1 | 150000 | 0.034 |
1 | 45454 | 0.033 |
Price($) | Vol. | No. |
---|---|---|
0.039 | 69999 | 2 |
0.040 | 20000 | 1 |
0.041 | 76412 | 1 |
0.042 | 171626 | 2 |
0.045 | 50000 | 1 |
Last trade - 15.28pm 18/07/2024 (20 minute delay) ? |
Featured News
VRX (ASX) Chart |