AS2 5.66% 5.0¢ askari metals limited

Ann: Askari Provides Exploration Update at Uis Lithium Project, page-2

  1. 1,909 Posts.
    lightbulb Created with Sketch. 1193
    confirmation there has been a delay receiving assays, but everything's proceeding:

    "The Company had initially intended to also test below mineralised pegmatites identified by phase one drilling during the current campaign but delays in receiving assay results has resulted in the decision to focus drilling on new areas."

    this is promising:

    "Encouragingly, the primary zone of mineralisation runs through Andrada Mining Limited (LSE: ATM) Uis Mine, as well as Andrada Mining Limited (LSE: ATM) B1 and C1 pegmatites (refer to Figure 5, below). All three of these sites have current and historic economic lithium mineralisation."

    "Example of a pegmatite containing spodumene on the Uis Lithium Project with an inlay of drill core from Andrada Mining Limited (LSE: ATM) recent B1/C1 diamond drilling campaign for comparison."

    https://hotcopper.com.au/data/attachments/5194/5194591-be06aa7777d25a26e166aace5cdef88b.jpg

    https://hotcopper.com.au/data/attachments/5194/5194594-3115f99830701e9e56aca1f65938257d.jpg
 
watchlist Created with Sketch. Add AS2 (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
-0.003(5.66%)
Mkt cap ! $4.885M
Open High Low Value Volume
5.1¢ 5.3¢ 5.0¢ $24.35K 480.4K

Buyers (Bids)

No. Vol. Price($)
1 9930 5.0¢
 

Sellers (Offers)

Price($) Vol. No.
5.2¢ 30000 1
View Market Depth
Last trade - 15.29pm 10/05/2024 (20 minute delay) ?
Last
5.0¢
  Change
-0.003 ( 0.00 %)
Open High Low Volume
5.0¢ 5.3¢ 5.0¢ 127275
Last updated 15.13pm 10/05/2024 ?
AS2 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.