ASM 0.87% 57.0¢ australian strategic materials limited

Ann: ASM TO ACQUIRE 95% OF ZIRONTECH, page-82

  1. 1,688 Posts.
    lightbulb Created with Sketch. 223

    Be interesting to see if and when we get an ANN on the percentage energy savings ZironTech enables the processing of Zirconium.
    Or have we already had that ANN and I missed it?

    Thu, 2 Jul 2020
    Highlights:
    • Commercial Pilot Plant Commissioned on Time and on Budget
    • ~30kg of titanium metal alloy was produced during the commissioning of the Commercial
    Pilot Plant
    • In the next phase, the alloy will be used to produce high purity (99.9%) titanium metal via
    the Electro refining process.
    • The patented method of metal production utilizes 45% less power than current industry
    methods

    Mon, 13 Jul 2020
    Highlights:
    • Successful laboratory production of ~ 1kg of neodymium metal alloy.
    • Assaying confirms an intermediate neodymium (87%) alloy ingot.
    • Electrorefining to produce a 99.9% Nd metal is anticipated by the end of July.
    • Commercial Pilot Plant production of larger quantities of neodymium and
    praseodymium metal alloys expected to be complete at the end of July 2020.
    • Metallisation process targets 45% less energy for rare earth metal production than
    the current industrial process.

    Tue, 28 Jul 2020
    Highlights:
    • Subsequent run of pilot plant produces another 22kg of titanium metal alloy
    • This test run confirms this patented metal production method uses up to 50% less energy
    than current commercial production methods
    • Electro refining process to produce high purity (99.9%) titanium metal progressing with
    results expected in August
    Highlights:
    • Successful production of 7.6 kg of neodymium metal
    • Assay confirms neodymium produced is at 99.8% purity
    • Metal purity is higher than typically traded neodymium metal
    • Validation of the patented carbon-free metallisation technology for rare earth
    metals

    Mon, 10 Aug 2020Highlights:
    • Titanium metal successfully produced through electro-refining process
    • Commercial pilot plant produces 9.16kg Ti metal powder assaying 99.83%
    • Confirmation of patented metal production method
    • Forward plan for Commercial Pilot Plant Dysprosium, Praseodymium and Zirconium metal in
    August

    Wed, 19 Aug 2020
    JV PRODUCES SECOND KEY PERMANENT MAGNET METAL Pr
    Highlights:
    • Praseodymium metal successfully produced at Korean pilot plant
    • Commercial pilot plant produces 5.3 kg Pr metal assaying 99.3 %
    • Confirmation of patented metal production method for permanent magnet metals
    • Forward plan for Commercial Pilot Plant production of Neodymium / Praseodymium and
    Dysprosium metal in August

    Thu, 27 Aug 2020
    JV PRODUCES HIGH PURITY TITANIUM METAL
    Highlights:
    • High purity titanium (Ti) metal 20.8 kg produced assaying 99.83 %
    • Innovative metals process confirms 70 % lower energy consumption
    • ZionTech optimisation increase metal efficiency by 50%
    • Significant environmental benefits of innovative metal process confirmed
    Last edited by ssyd: 06/09/20
 
watchlist Created with Sketch. Add ASM (ASX) to my watchlist
(20min delay)
Last
57.0¢
Change
-0.005(0.87%)
Mkt cap ! $101.5M
Open High Low Value Volume
56.5¢ 57.5¢ 54.5¢ $164.8K 296.0K

Buyers (Bids)

No. Vol. Price($)
9 19691 56.0¢
 

Sellers (Offers)

Price($) Vol. No.
57.0¢ 6686 4
View Market Depth
Last trade - 13.48pm 18/09/2024 (20 minute delay) ?
ASM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.