Be interesting to see if and when we get an ANN on the percentage energy savings ZironTech enables the processing of Zirconium.
Or have we already had that ANN and I missed it?Thu, 2 Jul 2020Highlights:
• Commercial Pilot Plant Commissioned on Time and on Budget
• ~30kg of titanium metal alloy was produced during the commissioning of the Commercial
Pilot Plant
• In the next phase, the alloy will be used to produce high purity (99.9%) titanium metal via
the Electro refining process.
• The patented method of metal production utilizes 45% less power than current industry
methodsMon, 13 Jul 2020Highlights:
• Successful laboratory production of ~ 1kg of neodymium metal alloy.
• Assaying confirms an intermediate neodymium (87%) alloy ingot.
• Electrorefining to produce a 99.9% Nd metal is anticipated by the end of July.
• Commercial Pilot Plant production of larger quantities of neodymium and
praseodymium metal alloys expected to be complete at the end of July 2020.
• Metallisation process targets 45% less energy for rare earth metal production than
the current industrial process.Tue, 28 Jul 2020Highlights:
• Subsequent run of pilot plant produces another 22kg of titanium metal alloy
• This test run confirms this patented metal production method uses up to 50% less energy
than current commercial production methods
• Electro refining process to produce high purity (99.9%) titanium metal progressing with
results expected in August
Highlights:
• Successful production of 7.6 kg of neodymium metal
• Assay confirms neodymium produced is at 99.8% purity
• Metal purity is higher than typically traded neodymium metal
• Validation of the patented carbon-free metallisation technology for rare earth
metals
Mon, 10 Aug 2020Highlights:
• Titanium metal successfully produced through electro-refining process
• Commercial pilot plant produces 9.16kg Ti metal powder assaying 99.83%
• Confirmation of patented metal production method
• Forward plan for Commercial Pilot Plant Dysprosium, Praseodymium and Zirconium metal in
August
Wed, 19 Aug 2020
JV PRODUCES SECOND KEY PERMANENT MAGNET METAL PrHighlights:
• Praseodymium metal successfully produced at Korean pilot plant
• Commercial pilot plant produces 5.3 kg Pr metal assaying 99.3 %
• Confirmation of patented metal production method for permanent magnet metals
• Forward plan for Commercial Pilot Plant production of Neodymium / Praseodymium and
Dysprosium metal in August
Thu, 27 Aug 2020
JV PRODUCES HIGH PURITY TITANIUM METAL
Highlights:
• High purity titanium (Ti) metal 20.8 kg produced assaying 99.83 %
• Innovative metals process confirms 70 % lower energy consumption
• ZionTech optimisation increase metal efficiency by 50%
• Significant environmental benefits of innovative metal process confirmed
- Forums
- ASX - By Stock
- ASM
- Ann: ASM TO ACQUIRE 95% OF ZIRONTECH
Ann: ASM TO ACQUIRE 95% OF ZIRONTECH, page-82
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASM (ASX) to my watchlist
(20min delay)
|
|||||
Last
57.0¢ |
Change
-0.005(0.87%) |
Mkt cap ! $101.5M |
Open | High | Low | Value | Volume |
56.5¢ | 57.5¢ | 54.5¢ | $164.8K | 296.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 19691 | 56.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
57.0¢ | 6686 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 19285 | 0.560 |
1 | 922 | 0.555 |
8 | 25402 | 0.550 |
7 | 71297 | 0.545 |
3 | 14651 | 0.540 |
Price($) | Vol. | No. |
---|---|---|
0.570 | 6686 | 4 |
0.575 | 2733 | 3 |
0.580 | 43610 | 6 |
0.585 | 56806 | 5 |
0.590 | 2559 | 1 |
Last trade - 13.48pm 18/09/2024 (20 minute delay) ? |
Featured News
ASM (ASX) Chart |