agree. AVZ has yet to build a Hydroxy dam, roads and infrastructure before they start mining.
They constantly miss deadlines and milestones. There's so much upramping it isn't funny
still waiting for Mining Licence after being promised by 6 months. That was last November.
DRC constantly has "meetings" etc with no results.
So I jumped ship and came to CRR. At least now I have some ideas of milestones CRR needs to go thru and unlike corrupt Congo, there won't be any hold ups.
No Chinese to appease hopefully as no one trusts them anymore.
Hold 12.5 Held
- Forums
- ASX - By Stock
- CRR
- Ann: Assay Results Confirm High Grade Lithium at Mavis Lake
Ann: Assay Results Confirm High Grade Lithium at Mavis Lake, page-34
-
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.46M |
Open | High | Low | Value | Volume |
0.7¢ | 0.7¢ | 0.6¢ | $10.92K | 1.598M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 300000 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 3308271 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 300000 | 0.006 |
29 | 12314033 | 0.005 |
18 | 14677129 | 0.004 |
7 | 60556375 | 0.003 |
7 | 15230001 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 3308271 | 14 |
0.008 | 1329577 | 11 |
0.009 | 3120795 | 12 |
0.010 | 3162149 | 13 |
0.011 | 200000 | 2 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
CRR (ASX) Chart |