Economics 101.
All comes down to: is this economical to mine at price Ni being X for IGO's setup and plans . Footprint is critical
Nothing wrong with 4.5m intecept, if its 1km long plus and 200m+ in structural depth. - for some small scale miner that would put 2mt ore about 4-5 years of ore on to feed through 450ktpa concentrator.
IGO is 2mpta they want a sizeable deposit of 15 - 20mt size wise, to last them another 7 - 10 years and secure off take contracts in place.
- Forums
- ASX - By Stock
- LEG
- Ann: Assay Results from RKDD015 and RKDD018 at Mawson
Ann: Assay Results from RKDD015 and RKDD018 at Mawson, page-31
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LEG (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
0.001(9.09%) |
Mkt cap ! $34.91M |
Open | High | Low | Value | Volume |
1.2¢ | 1.3¢ | 1.1¢ | $29.00K | 2.392M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1075921 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 226004 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 1075921 | 0.012 |
4 | 2452271 | 0.011 |
6 | 2128718 | 0.010 |
6 | 3426111 | 0.009 |
3 | 1493800 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 226004 | 1 |
0.014 | 809823 | 1 |
0.015 | 2100000 | 2 |
0.016 | 458000 | 3 |
0.017 | 1300000 | 2 |
Last trade - 15.57pm 23/08/2024 (20 minute delay) ? |
Featured News
LEG (ASX) Chart |
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online