It's the same Geologist in charge - correct?
They paid the expense to drill diamond core, the benefit over RC drilling is that you can be selective with your sampling - however this bloke decided 2m samples all the way down hole is sufficient.
Even a non-geo will understand that there will be a visible difference between rock grading 0.00g/t Pt (23-25m) and 4.02g/t Pt (25-27m).
Another benefit of diamond drilling is that you can take structural measurements of features. However these blokes decided to drill vertical holes - meaning any measurement is without an azimuth - pointless.
Also:
- Forums
- ASX - By Stock
- BCM
- Ann: Assay Results - TED 010
Ann: Assay Results - TED 010, page-9
-
-
- There are more pages in this discussion • 144 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.6¢ |
Change
-0.001(5.88%) |
Mkt cap ! $13.29M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.6¢ | $5.894K | 368.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 224848 | 1.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.7¢ | 6106 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 224848 | 0.016 |
5 | 504942 | 0.015 |
1 | 71391 | 0.014 |
2 | 1049180 | 0.012 |
4 | 1000500 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.017 | 6106 | 1 |
0.018 | 470596 | 2 |
0.019 | 750000 | 1 |
0.020 | 64485 | 2 |
0.021 | 129144 | 1 |
Last trade - 15.03pm 12/07/2024 (20 minute delay) ? |
Featured News
BCM (ASX) Chart |