to expand that just a little more:
from the release:
MAD82 – The Eastern Line:
A new Eastern Line was added to the current programme to test the eastern extension of the MAD71
mineralisation based on the DHEM and geological modelling. MAD82 was the first drill hole completed on
this line and was completed to a downhole depth of 61.3m. The drill hole intersected 26.5m of ultramafic
with patches of disseminated sulphides between 28.7-38.5m. MAD82 has identified an extension of the thick
ultramafic to the east.
A further two drill holes are planned to be completed on this Eastern Line prior to the Christmas break.
Based on the intersection angle of the drilling with the modelled ultramafic unit, downhole widths are
interpreted to be close to true widths.
- Forums
- ASX - By Stock
- Ann: Assays Confirm Best Ever Intersection at Mt Alexander
to expand that just a little more: from the release: MAD82 – The...
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.002(6.25%) |
Mkt cap ! $25.20M |
Open | High | Low | Value | Volume |
2.4¢ | 2.6¢ | 2.4¢ | $50.84K | 1.996M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 751317 | 2.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 6000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 751317 | 0.024 |
6 | 3708719 | 0.023 |
4 | 4032040 | 0.022 |
2 | 260000 | 0.021 |
3 | 201000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 6000 | 1 |
0.027 | 433400 | 3 |
0.028 | 709799 | 5 |
0.029 | 365701 | 2 |
0.030 | 402784 | 2 |
Last trade - 15.44pm 28/06/2024 (20 minute delay) ? |
Featured News
SGQ (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online