AW1 14.3% 12.0¢ american west metals limited

my guess is drill and blast so will need dozer, something like...

  1. 1,983 Posts.
    lightbulb Created with Sketch. 486
    my guess is drill and blast so will need dozer, something like CAT D9, probably 2 excavators, front end loader x 2. Feed into crusher, might need 2 jaw crushers subject to rocks sizes coming from pit then the smaller broken down rock is feed into ore sorter to obtain something similar too a 20mm road base material, which would then be hauled to stockpile. I would think at least 8 or 9 in team required per shift. Could easily double shift 8 to 10 hrs per shift due to long daylight hours that time of year. Plenty goes wrong with machines so plenty of maintenance required. I recokon the best one could hope for is 16 hrs per day between 100 & 200t per hour but like Jez mentions depends on size of crushers, hardness of rock etc
 
watchlist Created with Sketch. Add AW1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.