ETR 0.00% 0.7¢ entyr limited

Ann: Atzam Oil Project Update , page-28

  1. 2,143 Posts.
    lightbulb Created with Sketch. 235
    1/4 due in the next couple of days will hopefully clarify
    where things are at re: storage, production plans ect...should have some sales figures in there too.
    no water is very positive as the previous wells drilled on Atzam had major problems with it, 3 months production and no sign of water is a great result.
    Its difficult geology and the operator has a handle on it with this well, the info learnt helping the next drill.

    GLTA

 
watchlist Created with Sketch. Add ETR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.