Couldn't agree more Ozzy. Pathetic reporting.
-We had drilled to 1250 feet with announcement on 20th Feb. Why are we only hearing about oil shows now?
-20 days ago we were told that drilling program was delayed due to *rig maintenance*..No formal explanation. Company would not outline when enquiries made. Was this a fabrication?
-Having already installed the testing equipment, why is drilling STILL not restarted?
Does anyone in the industry understand how long it would actually take a competent crew to install flow test tanks and separator units?
- Forums
- ASX - By Stock
- Ann: Atzam Project Update
Couldn't agree more Ozzy. Pathetic reporting.-We had drilled to...
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable