Vast have a pilot plant at Jemalong in NSWIt is rated at 6MW...

  1. 129 Posts.
    lightbulb Created with Sketch. 15
    Vast have a pilot plant at Jemalong in NSW
    It is rated at 6MW (thermal energy) but only 1.1MW electrical output.
    Its conversion efficiency, from thermal to electric is therefore 18% which is worse than a gas turbine or diesel generator.

    Most solar pv panels generate around 200W per square meter.

    Vast CSP 1.1MWe pilot plant occupies an area of approx 250m x 250m for an equivalent output of 18W per square meter.

    If the plan is to temprarily store thermal energy in TESS then the losses will increase and final W/m2 will be even lower.
    The only way to make up these losses is to sell that energy at a very high price but battery storage will always out compete until they are all discharged.
    ie 14D will be at the end of the queue.

    I dont expect the Vast CSP to see the light of day.

    SolarPV+battery is the way for 14D to generate revenue but I suspect they will spend it all flogging a dead horse called TESS

    Been a holder for two years and wish I could be more positive but if they run with CSP Ill be selling out

    GLTAH
 
watchlist Created with Sketch. Add 14D (ASX) to my watchlist
(20min delay)
Last
7.8¢
Change
0.001(1.30%)
Mkt cap ! $18.57M
Open High Low Value Volume
7.8¢ 7.8¢ 7.8¢ $2 26

Buyers (Bids)

No. Vol. Price($)
1 10000 7.9¢
 

Sellers (Offers)

Price($) Vol. No.
8.3¢ 18750 1
View Market Depth
Last trade - 12.41pm 03/05/2024 (20 minute delay) ?
Last
7.7¢
  Change
0.001 ( 3.75 %)
Open High Low Volume
7.7¢ 7.7¢ 7.7¢ 2474
Last updated 12.41pm 03/05/2024 ?
14D (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.