Vast only have their 1.1MW pilot CSP plant.
They sold the 50MW PV component (before it was actually built) to Genex.
ie the project application, planning approvals etc
AFAIK they never built the proposed 30MW CSP project which was originally planned for the same site at Jemalong NSW
As for approvals for CSP at the SA site well 14D already have that.
It would make more sense to license the Vast CSP design but I suspect the thermal receiver temperature isnt high enough for TESS's 1414 degree melting point.
- Forums
- ASX - By Stock
- Ann: Aurora Project Update - Vast Solar MOU
Vast only have their 1.1MW pilot CSP plant.They sold the 50MW PV...
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 14D (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.8¢ |
Change
0.001(1.30%) |
Mkt cap ! $18.57M |
Open | High | Low | Value | Volume |
7.8¢ | 7.8¢ | 7.8¢ | $2 | 26 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 7.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.3¢ | 18750 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 0.079 |
1 | 3846 | 0.078 |
4 | 278779 | 0.077 |
1 | 19977 | 0.076 |
1 | 13333 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 18750 | 1 |
0.084 | 10752 | 1 |
0.090 | 70000 | 1 |
0.095 | 76503 | 2 |
0.098 | 1899 | 1 |
Last trade - 12.41pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
7.7¢ |
  |
Change
0.001 ( 3.75 %) |
|||
Open | High | Low | Volume | ||
7.7¢ | 7.7¢ | 7.7¢ | 2474 | ||
Last updated 12.41pm 03/05/2024 ? |
Featured News
14D (ASX) Chart |