MEU 2.50% 3.9¢ marmota limited

For those who think this is step out drilling or more...

  1. 3,857 Posts.
    lightbulb Created with Sketch. 459
    For those who think this is step out drilling or more exploration. Its not ,that starts after this diamond drill campaign which is for this purpose.

    Objectives of Diamond Drilling Program The July 2021 diamond program is primarily a production-focused program, designed to provide the necessary detail to advance Aurora Tank to production, including: 1. Geotechnical: design of optimal pit walls at Aurora Tank 2. Bulk Density measurements: Required for completing (a) resource estimation and (b) scoping/feasibility studies 3. Bulk samples to enable final phase metallurgical testing across: a) different weathering zones (from strongly weathered oxide zones to deeper fresh rock) and b) different areas of the deposit, including the first diamond drilling in the high-grade NW flank Marmota Chairman, Dr Colin Rose, said: “ We are delighted to get the long-awaited diamond drilling program underway. This program is focused primarily on advancing Aurora Tank to production. Marmota is also planning a separate RC program aimed at further exploration and growth, following the diamond program. We are carrying out the diamond program first, as our priority is to get the necessary scoping/feasibility/final metallurgical studies completed as soon as possible. ”

    But we are now on our way...

    Taken from ann 11/6/2021.....Hope its helpful.
    Last edited by locky27: 02/07/21
 
watchlist Created with Sketch. Add MEU (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
-0.001(2.50%)
Mkt cap ! $42.37M
Open High Low Value Volume
4.0¢ 4.0¢ 3.9¢ $3.304K 84.40K

Buyers (Bids)

No. Vol. Price($)
1 144650 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.9¢ 76225 1
View Market Depth
Last trade - 15.34pm 03/09/2024 (20 minute delay) ?
MEU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.