CFU grid connection 24/7 power,
PV takes 3 years to produce any energy return over the energy required to produce the PV cells, and generally has a cost return of 7 to 25 years depending on sunlight and now that PV tariff's are reducing ( Victoria now 24c not 75c as I originally signed up)
I'm a jaded PV supporter by the way,
Now there is something which will be a game changer here ans that is if they introduce tarriff incentive's for Fuel Cells the way they have in UK.....
Rg
DYOR
mapreader
Add to My Watchlist
What is My Watchlist?