PEX 7.14% 13.0¢ peel mining limited

Ann: Australian Copper Conference Presentation, page-12

  1. 780 Posts.
    lightbulb Created with Sketch. 34
    Eshmun t2 has been drilled and minor disseminated sulphides were hit. In other words nothing of great value. DHEM is planned. A down hole electromagnetic survey is planned. Dhem is a good way to pick up strong conductive anomalies and have been very successful at Mallee Bull. So the answer is yes it has been drilled and is open to further testing by dhem. See below for a copy and paste from last months announcement.

    The second priority target (T2), defined as a moderate to strong chargeable anomaly is located ~250m to the west of Mallee Bull commencing at ~250m below surface and continuing to about ~450m below surface, was tested by a single 500m deep diamond drillhole (MBDD015). Zones of chlorite alteration and fracturing were noted in the drillcore, however only minor disseminated sulphide mineralisation was noted at levels higher than expected. DHEM surveying is planned.
 
watchlist Created with Sketch. Add PEX (ASX) to my watchlist
(20min delay)
Last
13.0¢
Change
-0.010(7.14%)
Mkt cap ! $78.44M
Open High Low Value Volume
13.5¢ 13.5¢ 13.0¢ $16.94K 125.9K

Buyers (Bids)

No. Vol. Price($)
1 37031 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 122177 2
View Market Depth
Last trade - 11.15am 17/07/2024 (20 minute delay) ?
PEX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.