SYA 3.13% 3.3¢ sayona mining limited

From what I read on the website providing BAPE details, there is...

  1. 3,108 Posts.
    lightbulb Created with Sketch. 7
    From what I read on the website providing BAPE details, there is a 30day consultation and 21 day review period. Add on any additional time required to prepare the required documents (Which I suggest will be minimal if they are already holding public consultations).

    We're talking an extra two-to-three months to have an increased production capacity approved. Is this a realistic reason to wipe $17m off the MCap?
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.001(3.13%)
Mkt cap ! $339.6M
Open High Low Value Volume
3.3¢ 3.4¢ 3.2¢ $1.115M 34.04M

Buyers (Bids)

No. Vol. Price($)
131 21151240 3.2¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 1618716 6
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
3.3¢
  Change
0.001 ( 0.31 %)
Open High Low Volume
3.3¢ 3.4¢ 3.2¢ 21020600
Last updated 15.59pm 03/05/2024 ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.