AVZ 0.00% 78.0¢ avz minerals limited

14 Days to drill 1 hole presumably with 1 rig. With 5 rigs...

  1. 213 Posts.
    lightbulb Created with Sketch. 27
    14 Days to drill 1 hole presumably with 1 rig.
    With 5 rigs drilling, we'll get 5 holes in 14 days.
    Total time to drill 80 holes is 224 days?

    Does that sound right or have I stuffed up by calculations?
 
watchlist Created with Sketch. Add AVZ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.