AVZ 0.00% 78.0¢ avz minerals limited

Ann: AVZ Awards FEED Study to Progress Manono Project, page-26

  1. 4 Posts.
    FEED stands for Front End Engineering and Design. It's the most important phase of a project and the key deliverable is a class 3 estimate giving the client assurity of cost and schedule with contingencies to enable them to move to Final Investment Decision (FID).
 
watchlist Created with Sketch. Add AVZ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.