I agree we have enough drilling to the 300+ levels.
What we do need is more infill drilling at sufficient spacing to 75 - 100m that achieves JORC at presumed solid proven spod. That will get the most value.
- Forums
- ASX - By Stock
- AVZ
- Ann: AVZ Continues to Drill Thick High Grade Lithium Intercepts
Ann: AVZ Continues to Drill Thick High Grade Lithium Intercepts, page-95
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)