X section on pg 3, 4 clearly indicates that 2 of the holes were to establish the pit boundary on the NW hence shallow depth of 72m & 92m with less pegmatite.
Whilst the other 2 DD holes, (ie #2 & #4) r in the guts so had a large Intersection.
Good result for AVZ, especially after dewatering the Pit & that's allowed them to access the pit floor & drill directionally to fill up the missing bits. I'd expect the next section line to show similar sort of results, i.e thinner pegmatite body towards the existing pit's edge & thicker in the guts.
AVZ Price at posting:
18.5¢ Sentiment: None Disclosure: Not Held