AVZ 0.00% 78.0¢ avz minerals limited

You are correct............. materials required including...

  1. 2,823 Posts.
    lightbulb Created with Sketch. 4669
    You are correct............. materials required including railway sleepers are on site. Railway company will not commence the refurbishment/upgrade until the transportation contracts are signed. It will take approximately 6 months to perform the work.

    All IMO & DYOR


 
watchlist Created with Sketch. Add AVZ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.