Ah sick, confirming what was suspected. As long as the existing pit works, that's the opportunity for production of ore from the moment the first blasting charge goes off. If AVZ can stick to the timeline, it's going to be an interesting 20 months!
It's been a hot minute since I've looked at the drill intercepts. Boner inducing stuff.
Ann: AVZ Delivers Positive Drill Results - Manono Project, page-7
Add to My Watchlist
What is My Watchlist?